CAMERON HARBOR

Cameron Harbor Marina came with unique challenges. The narrowed section of the TN river through CHA created two obstacles:

  • Increased current velocities to cope with

  • Wide range of water depth variances due to upstream water runoff from heavy weather 

Specialized engineering included : Securing structure to endure these stresses required larger than normal spud pole installation (2’ diameter) & Aluminum gangway design utilized our “swing” landing-support to accommodate both High and low water levels

The  finished design resulted in an aesthetically pleasing complement to an upscale town home development co-located on the river bank convenient to the downtown area 

 

This Marina features:

  • Sizable slips designed to accommodate water crafts of all sizes.

  • Gangway Access

  • A courtesy dock.

  • All construction is the standard galvanized truss frame base, sealed flotation, heavy gauge roof construction, and telescopic spud pole anchoring.

  • The unique decking done in high-end walnut composite gives the docks a special.

  • Water and power to all slips.